USE OF THE INFORMATION MODEL OF THE OBJECT DURING THE OPERATIONAL PERIOD OF THE INVESTMENT AND CONSTRUCTION PROJECT

  • O.V. Veretennikova Donbas National Academy of Civil Engineering and Architecture, Makeevka, The Donetsk People’s Republic
  • I.V. Sycheva Donbas National Academy of Civil Engineering and Architecture, Makeevka, The Donetsk People’s Republic
  • V.A. Sendetsky Donbas National Academy of Civil Engineering and Architecture, Makeevka, The Donetsk People’s Republic
  • E.G. Rykunova Donbas National Academy of Civil Engineering and Architecture, Makeevka, The Donetsk People’s Republic

Abstract

The article is devoted to the analysis of the use of modern information technologies, namely BIM-technologies, at certain stages of the life cycle of an investment and construction project. In the introductory part of the article, the importance of the BIM-technologies introduction and their place in the management of an investment and construction project are outlined. It has been determined that the use of modern information technologies is directly related to increasing the efficiency of an investment and construction project. The article analyzes the latest research and publications, considers fundamentally new approaches to the design and management of the object's life cycle, the stages of creating an information model of an object, structuring information models depending on the stages of the life cycle of an investment and construction project, identifying the stages of a construction object operation. It is substantiated that, depending on the stage of work with the object, it is advisable to use information models of different types to achieve goals that are different at the corresponding stages of the object's life cycle. The process of using information models is graphically presented, depending on the stage of work with the construction object. The problems faced by information modeling at the stage of object operation have been identified. It is concluded that since the operation stage is the longest, therefore, the active involvement of maintenance services in the formation of requirements for the designed facility is required, which will ensure future operation using information models. Digitizing an object, creating a digital asset, will optimize the business processes of an investment and construction project, increase their efficiency and reduce costs. The advantages and disadvantages of using the information model of an object during the operational period of an investment and construction project are revealed.

Keywords

BIM-technology, investment and construction project, object information model, project information model, operational information model

References

Panteleenko L.D. Aktual'nost' primeneniya BIM tekhnologii v stroitel'stve [The relevance of the use of BIM technology in construction] / In Proceedings – International Scientific and Technical Conference of Young Scientists BSTU named after V.G. Shukhov: conference materials, Belgorod, 2021. Belgorod: Belgorod State Technological University named after V.G. Shukhov, 2021. Pp. 1230-1237. (In Russ).

Informatsionnoye modelirovaniye ob"yektov promyshlennogo i grazhdanskogo stroitel'stva [Information modeling of industrial and civil engineering facilities] (2017). Veles. (In Russ.). URL: www.bimtechnology.pro (accessed on 17.01.2022).

Sharmanov V.V., Simankina T.L., Mamaev А.Е. Risk control construction through BIM // Construction of Unique Buildings and Structures. 2017. Vol. 12(63). Pp. 113-124. (In Russ.). DOI: 10.18720/CUBS.63.6

Mamaev А.Е. Evaluation of the economic efficiency of using information modeling to control the level of security in construction // Economics: Yesterday, Today and Tomorrow. 2020. Vol. 10(3-1). Pp. 48-56. (In Russ.). DOI: 10.34670/AR.2020.94.4.006

Goldobina L.A., Orlov P.S. BIM technology and experience of their introduction into educational process for training bachelor students of major 08.03.01 «Construction» // Journal of Mining Institute. 2017. Vol. 224. Pp. 263-272. DOI: 10.18454/PMI.2017.2.263

Mishchenko A.V., Gorbaneva E.P., Preobrazhensky M.A. Reduction of the BIM dimension of the full life cycle of building and facilities // Russian Journal of Building Construction and Architecture. 2021. Vol. 4(52). Pp. 95-105. DOI: 10.36622/VSTU.2021.52.4.009.Ара

Gorbaneva E.P., Mishchenko A.V. Information modeling of real estate at the stage of survey works // Russian Journal of Building Construction and Architecture. 2020. Vol. 2(46). Pp. 18-35.

Grakhov V.P., Kuznecov A.L., Kislyakova Yu.G. et al. Implementation of Digital Project Management for Construction and Operation of Energy-Efficient Residential Buildings // Science and Technique. 2021. Vol. 20(1). Pp. 66-74. (In Russ.). DOI: 10.21122/2227-1031-2021-20-1-66-74

Leonovich S.N., Riachi J. 3D-Modeling for Life Cycle of the Structure // Science and Technique. 2021. Vol. 20(1). Pp. 5-9. DOI: 10.21122/2227-1031-2021-20-1-5-9

Talapov V.V., Tanygina E.A. Features of creating an informational real estate model // INTEREXPO GEO-SIBERIA. 2020. Vol. 2(7). Pp. 16-20. (In Russ). DOI: 10.33764/2618-981X-2020-7-2-16-20

Manukhina L.A., Prykina L.V. Economic assessment of the life cycle of real estate // Journal of Economy and Entrepreneurship. 2019. Vol. 9(110). Pp. 1270-1274. (In Russ).

Talapov V.V. BIM i ekspluatatsiya: ne nado putat' informatsionnuyu model' s vechnoy igloy dlya primusa [BIM and exploitation: do not confuse the information model with the eternal needle for the primus] (2019). Stroitel'nyy ekspert [Construction expert]. (In Russ). URL: https://ardexpert.ru/article/16915 (accessed on 17.01.2022).

Shemyakina Т.Yu. Еconomic features of application of information modeling in construction practice // Modern Scientific Thought. 2020. Vol. 3. Рp. 159-164. (In Russ).

Тsypin Р.E., Belova M.V. Problems of management of investment-construction projects / In Proceedings – XVII ISPC “World science: problems and innovations”: collection of articles: in 3 parts, Penza, January 30, 2018. Penza: Nauka i Prosveshchenie, 2018. Рp. 105-106. (In Russ).

About the Authors

Oksana V. Veretennikova – Doctor of Economics, Professor; Dean of Department, Donbas National Academy of Civil Engineering and Architecture, Makeevka, The Donetsk People’s Republic. E-mail: veretennikova_ok@mail.ru. SPIN РИНЦ 8610-0051. ORCID 0000-0003-3635-2473
Irina V. Sycheva – Senior Lecturer, Donbas National Academy of Civil Engineering and Architecture, Makeevka, The Donetsk People’s Republic. E-mail: i.v.sycheva@donnasa.ru
Vadim A. Sendetsky – Student in the Master’s programme, Donbas National Academy of Civil Engineering and Architecture, Makeevka, The Donetsk People’s Republic.
E-mail: sendetskiy.v.a-isi-1@donnasa.ru.
Ekaterina G. Rykunova – Student in the Master’s programme, Donbas National Academy of Civil Engineering and Architecture, Makeevka, The Donetsk People’s Republic. E-mail: rykunova.e.g-isiu-2@donnasa.ru

For citation

Veretennikova O.V., Sycheva I.V., Sendetsky V.A., Rykunova E.G. Use of the Information Model of the Object During the Operational Period of the Investment and Construction Project // BENEFICIUM. 2022. Vol. 1(42). Pp. 9-15. (In Russ.). DOI: 10.34680/BENEFICIUM.2022.1(42).9-15

Published
2022-04-13
Section
ENTERPRISE MANAGEMENT TOOLS